Laserfiche WebLink
PROPOSAL <br />Mon <br />American Industrial Refrigeration <br />Mechanical Contractors <br />14322 2181 Ave. No. • Plymouth, MN 955447 *Phone (952) 470 -9610 *Fax (952) 470.9617 <br />omPPOW NSme <br />Elk River Arena <br />Phone I Fax <br />763 -635 -1141 <br />Date <br />311111 <br />street Address <br />1000 School Rd <br />4OU010 rwrneer <br />0311 -04 -GB <br />tate,ilP <br />Psoled eealton <br />Elk River, MN 55330 <br />Arena — west end <br />llentforr <br />Rich Czech <br />Project oescrip on <br />Original rink condenser. upgrade <br />Dear Rich, <br />American Industrial Refrigeration (AIR) proposes to furnish and Install a new BAC evaporative <br />condenser model # VC1 -125 In place of the existing model# VC1 -90. The existing condenser would <br />be isolated, pumped down and evacuated. The refrigerant and water piping would be disconnected <br />and the condenser cut loose from its supports. The existing unit would be craned off and new support <br />steel Installed on the base. Once the new support steel is installed the new condenser would be set in <br />place. The refrigerant piping and water supply and water drain lines can be re- connected. A pressure <br />test, leak check and an evacuation will then be performed. After the electrical wiring is finalized, a <br />start up, test and adjustment of the condenser would complete the installation. The evaporative <br />condenser, VFD fan motor control, technical labor, permit, crane, pipe & fittings, electrical wiring, <br />support steel and removal /demo of a second unused condenser are Included. <br />Elk River Arena net price ................... ............................... ....................$52,397.00. <br />Any additional materials, repairs, overtime labor and structural supports are not included and would be <br />over & above the figure quoted. <br />All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard <br />practices. Any alteration or deviation from above specifications involving extra costs will become an extra charge over <br />and above the estimate. American Industrial Refrigeration will not be held liable for agreements contingent upon strikes, <br />accidents or delays beyond our control. Building owner will carry fire, property and other necessary insurance. Our <br />workers are covered by workmen's compensation insurance. American Industrial Refrigeration will not be responsible for, <br />nor will bid on this project, any work or cost of asbestos abatement. Building owner will provide safe work area with free <br />access to carry out above work. As part of this Proposal, if it is required by the Contract, American Industrial <br />Refrigeration will provide commercial general liability coverage for the scope of AIR's work on the project to the fullest <br />extent of its current insurance coverage. American Industrial Refrigeration will not assume any insurance obligations <br />beyond that included in its current insurance policy. Upgrading of existing systems to meet the most current codes is <br />limited to scope of work detailed above. All work to be performed during normal workday (lam to 3:30 pm, M -1) on <br />straight time unless otherwise noted. Drain dawn and refilling of piping systems by others unless noted above. Warranty <br />includes one (1) year on all parts or materials installed and 90 days on labor. On all accounts over 30 days, customer <br />agrees to pay all reasonable collection fees and / or attorney fees. <br />14322 21st Ave. N. • Plymouth, MN 55447 TEL: (800) 310 -9610 - FAX: (962) 470 -9617 <br />216 Pleasant Ave. • PO Box 460 - Atwater, MN 56209 - TEL: (800) 279 -9031 - FAX: (320) 974 -8080 <br />