Laserfiche WebLink
RECEIVED 02/28/2011 11:00 <br />FEB -28 -2011 10:45 From:COPTIERIAL REFRIG 5Y 218 749 6810 To:17636351144 P,1 -14 <br />.�..._ ... �.. 105 -..P VV .. <br />�t�MM�AIGIAL �161�R111�IRggTiC1N �iY�TIlM6 <br />SALGO, 81:AVIC0. INSTAII -ATION a AePAIA <br />Mark Rudettoo • Jahn Redorlge 144 13e4t Chealnut 81tgp1 - R O. BOX 1004 <br />PhOnO (2113) Vlrglnfo, Minnsaoi• 136748 <br />PROPOSAL AND ACCEPTANCE <br />Proposal Submitted to: City of Elk River Date: February 28, 2011 Number: 2011.07 <br />Attu: Rich Czech <br />Job Name: Evaporative Condenser <br />Job Location: Elk River Ice Arena <br />We purpose to remove and replace: <br />Existing Baltimore Aircoil Model #VC1 -80 and replace with a Baltimore Aircoil Model #VC1- <br />126 Evaporative Condenser (see enclosed spcitications). Base capacity increase to 380/a, <br />Price: $241850,00 (Freight allowed, Minnesota Sales Tax Included) <br />Structural Beams ADD: $500.00 <br />Removed and Dispose of Existing Evaporative Condenser: $2,640.00 <br />Installation (Labor, Materials, Travel & Subsistence): $3,500.00 <br />VFD for Condenser Fan ADD: $2,500,00 <br />Payment Terms: <br />We; Tills KOPOUI MY In witlXMM by in It not <br />WAp%d won ..All - - days <br />Net 30 Days <br />i o -i 3 3, <br />Authorized Signature <br />Acceptance of Proposal - The above prices, specifications and conditlona are s8tlsfactory and are hereby <br />aaceptad. You are authorized to do the work as speclfied. Payment will be made as outlined above. <br />Signature Tide <br />Date <br />