Laserfiche WebLink
~: ~; <br />I`~j~~~ ~~3~~`C3C~~1 5faff [doles 8c A~ailat/ility <br />- ~ ,r <br />,' t ~ ~- <br />... r.. ...~ _ € <br />i F .u - <br />d t".~ t~ <br />~ ` i <br />~ ~ z Project review and. ~ ~.,~ <br />J a ~~ .~, <br />*, , decision-making team ~~~ ~~ . <br />L <br />a <br /> <br />H <br /> <br />~ <br />~ cr~fri Eng.neer€rrg <br />~ Jason Raverty, PE <br /> Stevens Engineering <br /> Will provide technical site <br /> design & engineering <br />Structural Engineering <br />Joe Pearce, PE <br />Nelson-Rudie & Assoc. <br />Will lead structural design <br />services <br />Project ~~anager/Architect <br />Pamela Bakken Anderson, AIA, CID <br />LEED AP <br />292 Design Group <br />Will be the key contact person and <br />oversee all phases of the work <br />Project C~esignerfArchitect <br />Mark Wentzell, AIA <br />292 Design Group <br />Will provide overall design <br />leadership for the facility <br />lecl°€arrical EngineeriEE <br />Scott Rudie, PE <br />Nelson-Rudie & Assoc. <br />Will lead plumbing & <br />HVAC design <br />Electrical Engi€~eerin <br />Andy Erdmann, PE <br />Nelson-Rudie & Assoc. <br />Will lead power & lighting <br />systems design <br />AvaNabikity and Capak~ility <br />Each of the staff members listed above are currently available to begin <br />work with the City of Elk River and will remain with the project throughout <br />planning, design and construction. Additional design, drafting and support <br />staff will be assigned to the project as required by the schedule and project <br />requirements. <br />Gapies of individual staff resumes are provided under section E of this <br />proposal. <br />Elk River Public Works and Fleet Maintenance Facility <br />