My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. SR 02-14-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
02-14-2011
>
4.2. SR 02-14-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2011 10:35:29 AM
Creation date
2/11/2011 10:35:29 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~` <br />rc~~~t ~~~ra~~~ Project Understanding & Warkplan <br />Prepare the documents that will provide the detailed drawings and specifications <br />for the construction of the project that will become the basis for a contract between <br />the City of Elk River and the contractor for the project. <br />~`ifvr%C rc~u~ ~: A comprehensive construction document package. Deliverables <br />are based upon our defined project process guidelines and include: <br />• Updated project and construction schedule <br />• Final code review including code drawing, completed code review text and <br />zoning review drawings <br />• Construction Document drawings including site plan, floor plans, reflected <br />ceiling plans, roof plan, all exterior elevations, building and wall sections, <br />large scale plan drawings -final layout, interior elevations -final layout, <br />schedules and details <br />• Final civil layout including site plan/details, grading plan/details and utility <br />plan/details <br />• Final structural layout including building sub-grade foundation work, footings <br />and foundation plans, floor and roof framing plans and structural details <br />• Final mechanical layout including underground waste and supply lines, <br />mechanical equipment, distribution systems, floor plan layouts, mechanical <br />schedules and details <br />• Final electrical layout including distribution, equipment, floor plan layouts, <br />electrical services distribution and site light lighting electrical schedules <br />and details <br />• Layout of specialty systems <br />• Final specification by CSI division <br />• Assist in preparation of a final estimate of probable construction costs <br />Poe E i <br />Bidding and ~egotiotion <br />Assist the City of Elk River in obtaining bids for the project. Interpret the documents <br />and provide clarification to the bidders on the project. Prepare contracts for the <br />construction of the project. <br />Construction ~dministratian <br />Observe the construction work for conformance to drawings and specifications, <br />process shop drawings, evaluate contractor request for payment, prepare final <br />punch list, Certificate of Substantial Completion, and project closeout. <br />° `'~ ~ b~ <br />~ o: <br />~~ <br />~-~ . - <br />"~ "~^ ~- <br />i i <br />i ~ _ <br />i <br />i <br />\~ <br />. _ Elk River Public Works and Fleet Maintenance Facility • <br />
The URL can be used to link to this page
Your browser does not support the video tag.