Laserfiche WebLink
III. SCI-IEDULE AND PROJECT MANAGER <br /> <br />Project Manager: <br /> <br />Mr. Terry Maurer <br />Elk River Consultant City Engineer <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br /> <br />Telephone number: <br /> <br />612/644-4389 <br /> <br />Estimated letting date: <br /> <br />Estimated construction <br />completion date: <br /> <br />January, 1996 <br /> <br />August, 1996 <br /> <br />IV. NEED FOR PROJECT/PROJECT DISCUSSION <br /> <br />The construction of a traffic signal at the intersection of T.H. 10 and Joplin Street/185th Avenue <br />is part of a roadway construction project that will add a fourth leg to an existing T-intersection. <br />The new fourth leg, 185th Avenue, will intersect from the north. Beyond its intersection with <br />T.H. 10, it will curve to the west and join the north T.H. 10 frontage road. Joplin Street was <br />extended to intersect with T.H. 10 in the past year. The purpose was to provide an outlet to <br />T.H. 10 for a new south frontage road and for residential areas further to the south. <br /> <br />A traffic signal is needed at this location primarily because of commercial development that is <br />underway, proposed, and anticipated along the T.H. 10 frontage roads. Developments presently <br />being constructed include a strip commercial center with a gas station/convenience store, a fast <br />food restaurant, and specialty retail, and a 30,000 square foot office building. To the south, <br />construction is underway on single family detached residential units and townhomes. <br />DevelOPment proposed or anticipated within the next two years includes two additional office <br />buildings and a fast food restaurant south of T.H. 10, and a senior housing facility and two <br />commercial lots north of T.H. 10. '~ <br /> <br />230/27%2201 .sep <br /> <br /> <br />