Laserfiche WebLink
Sherburne Soil and Water Conservation District <br />Date: February 18, 2005 <br />Orono Park, Elk River <br />Cost Summary: Rain Garden and Filter Strip <br />Total Rain Garden Cost 12,100 <br />Total Filter Strip Cost 4,162 <br />Total Project Cost 16,262 <br />Landowner's Share (cash + in-kind): 25% $4,066 <br />Maximum Cost Share: 75% $12,197 <br />Potential landowner cash and in-kind breakdown: <br />In-kind <br />excavation and salvage topsoil -rain garden 1,050 <br />excavation and salvage topsoil -filter strip 219 <br />planting plugs -rain garden (volunteers) 650 <br />Apply herbicide 75 <br />Seed and install erosion control blanket 300 <br />Install silt fence 75 <br />Spread mulch 600 <br />Total in-kind $2,969 <br />Total cash $1,097 <br />