Laserfiche WebLink
Sherburne Soil and Water Conservation District <br />Date: February 18, 2005 <br />Orono Park, Elk River <br />Rain Garden <br />Practice 350 -Sediment Basin <br />Work or Material Qty. Unit Unit Amount <br /> Price <br />1) Herbicide (Roundup) 2 pint 25.00 50.00 <br />2) Excavation & Topsoil Salvage 350 Cu. Yd 3.00 1,050.00 <br />3) Shredded Wood Mulch (3" deep) 60 Cu. Yd 35.00 2,100.00 <br />4) Plant Materials (plugs) 3,224 ea 0.88 2,821.00 <br />5) Curb Cuts and road diversion 1 job 1,904.00 <br />Seed for inlet and outlet swales 1 job 10.00 <br />6) Erosion control blanket for Inlet and Outlet Swales <br />(NAG SC 150 BN) 0.5 ea 94.00 47.00 <br />7) Interpretive sign 1 ea 400.00 400.00 <br />8) Misc. labor: <br />Plant plugs (volunteers) 650.00 <br />Apply herbicide 1 job 50.00 <br />Seed and install control erosion blanket 1 job 75.00 <br />Spread mulch 1 job 600.00 <br />Sales Tax 326.17 <br />20% Contingency 2,016.63 <br />Total rain garden cost $12 100 <br />Landowner's share: 25% $3,025 <br />Maximum cost share: 75% $9,075 <br />