My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. ICESR 01-12-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2011
>
01-12-2011
>
5. ICESR 01-12-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2011 2:29:52 PM
Creation date
1/10/2011 1:42:44 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
1/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IJA <br />CLIENT: City of Elk River <br />PROJECT: Elk River Arena Renovation and Expansion <br />PROJECT LOCATION: Elk River, MN <br />PROJECT DESCRIPTION: <br />GENERAL: <br />Project to include studying the options and costs surrounding the replacement of one of the <br />two ice sheets at the Elk River Ice Arena, expanded lobby and concessions, new locker rooms <br />for the arena, and possibly co-use by High School teams for other sports. Possible field-house <br />addition, along with potential retail and office space. In addition, a possible skywalk connection <br />to the adjacent high school may be include din the study. <br />ARCHITECTURAL <br />Pre-Design Services only at this point. Upon refined project scope definition, a fee for A/E <br />serices will be proposed. <br />CIVIL ENGINEERING <br />Civil Engineer to advise on site utility issues and cost of relacations as required. No Civil <br />Engineering drawings in this phase. <br />STRUCTURAL ENGINEERING (Not Included in this proposal or phase) <br />MECHANICAL ENGINEERING (Not Included in this proposal or phase) <br />ELECTRICAL ENGINEERING (Not Included in this proposal or phase) <br />PROFESSIONAL SERVICES REQUIRED <br />PRELIMINARIES/PRE-DESIGN SERVICES <br />Pre-Design Services <br />Site Studies <br />Feasibility studies <br />Floor Plans <br />Elevations <br />Perspective <br />Presentation preparation <br />Client Meetings & Notes <br />Cost Estimating <br />EST. <br />HOURS <br />NOTES/CONSIDERATIONS <br />16 <br />16 <br />24 <br />8 <br />8 plus cost for rendering <br />8 <br />12 <br />16 <br />Measured Drawings <br />Verify field Conditions <br />Existing Drawings <br />Code Analysis <br />Programming <br />4 <br />12 <br />8 <br />12 <br />TOTAL ALL PHASES OF WORK ABOVE 144 HOURS <br />• <br />.] <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.