My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR STAFF REPORTS 01-11-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
01-11-2011
>
6.1. ERMUSR STAFF REPORTS 01-11-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 9:04:05 AM
Creation date
1/10/2011 11:59:42 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River~,~~`^-... <br />Municipal Utilities <br />UTILITIES COMMISSION MEETING <br />TO: FROM: <br />Elk River Municipal Utilities Commission Wade Lovelette. -Superintendent of Technical Services <br />John Dieta, Chatr <br />D 1 Thom son, Trustee <br />MEETTNG DATE: AGENDA ITEM NUMBER: <br />Janu 11, 2011 6.1 <br />SUBJECT: <br />StaffU dates-Su erintendentofTechnicalServices <br />DISCUSSION: <br />The following is a summary of projects and/or updates over the past several weeks: <br />This month the locating department had a total of twenty-seven locate tickets. <br />One of those was an "emergency" locate, two were updates and one was an <br />appointment. It was a slow month as far as locating goes but staff was busy with the <br />home energy audits and the thermal imaging camera for our equipment. <br />The Metering department continues with weekly and monthly substation checks, <br />and doing the monthly power bill. The meter change-out program is still continuing <br />as time permits. <br />Some staff are continuing to attend the weekly meetings for the Home Energy <br />Audit program. They are also doing a lot of the home energy audits. <br />The Security Systems department had a total of fifty-five phone contacts, six <br />personal visits, six systems quoted, nine sales made, eight installs completed and <br />twenty-one service calls for the month of December. This brings the YTD total <br />installs to 11.1. <br />Power plant staff did the monthly run on the engines. Everything went well and <br />Steve got the new fuel injectors in engine #2 so that they could exercise that one too. <br />Jeff Murray attended the transformer school along with three of the linemen. His <br />education seminar report is included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.