Laserfiche WebLink
Elk River ,~ <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk Rivet' MN 55330-0430 <br />UTILITIES COMMISSION MEETING <br />Phone: 763.441.2020 <br />Fax: 763.441.5099 <br />TO: FROM: <br />Elk River Municipal Utilities Commission Mark Fuchs <br />John Dietz, Chair Line Superintendent <br />D 1 Thom son, Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Jan 11, 2011 6.1 <br />SUBJECT: <br />Staff Updates <br />Discussion: <br />• Primary wire and three phase transformer have been installed at Cretex. We aze <br />waiting for their electrician to finish their work and then we will transfer them to <br />the new transformer. <br />• We have been fixing street lights that have a photo eye controller that feed <br />multiple lights at one time. <br />• Had to inspect our underground distribution switchgeaz because of a recall notice. <br />We have 35 of these units. In the spring we will have to change out gaskets on the <br />visible break windows. <br />• Had one new electric service. <br />• We will finish Area 22 rebuild and Engers addition rebuild in the spring after the <br />frost is out. There are a few transformers to take down and pull poles. <br />• The 5`h street rebuild job will be on hold until spring. <br />• We are getting equipment ready to start tree trimming. <br />