Laserfiche WebLink
Memo to the Mayor and City Council/CU 97-10 Page 5 <br />May 19, 1997 <br /> <br />5. Drainage plan be approved by the City Engineer prior to commencing <br /> work on site. This plan shall include the necessary detention and <br /> quality control pond as required by the City Engineer. <br /> <br />6. All outdoor storage be confined to the fenced area. <br /> <br />The Bridgeman's septic system, which encroaches onto this property, <br />shall have an easement established over it and recorded prior to <br />issuance of a building permit. <br /> <br />o <br /> <br />The ordinance amendment allowing development within the urban <br />service area prior to city sewer and water be approved by the City <br />Council. <br /> <br />o <br /> <br />No roof drainage from the proposed building shall be directed onto the <br />area of the existing drainfield. <br /> <br />10. <br /> <br />All septic easement issues be resolved between the property owners <br />prior to issuance of a building permit. <br /> <br />11. <br /> <br />Additional landscaping be included between the proposed building and <br />the Bridgeman's Restaurant immediately to the west. <br /> <br />s:\planning\cu97-10.doc <br /> <br /> <br />