My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 05-19-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
05/19/1997
>
6.2. SR 05-19-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:50 AM
Creation date
8/5/2003 8:45:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent by: DRB 6122919313; 05/12/97 19:09; Jcl'Fax #243;Page 28/39 <br /> <br />Landfill shall complete a Focused Feasibility Study, The Focused Feasibility Study shall <br />be submitted to City staffby June 1, 1999. <br /> <br />(05) VOC Remedial Acli0n. If necessary, the selected remedial measure for VOC <br />contaminants identified by the Feasibility Study must be constructed and operational by <br />March 1, 2001, unless good cause can be shown for a delay. <br /> <br />(09) Heavy_ Metal ConLaminant Monitoring and Assessmen[. Heavy metal contaminants <br />for surface water and groundwater must be addressed in addition to VOC contaminants. <br />Based on the need for additional monitoring~,,,"- '. 99.~ ,~,,,~-- ~ ,..,,j' ^~ to confirm exceedances <br />and identify trends, the Landfill shall {c,~adu,.-; } [~ntinu_el monitoring ~ and <br />-{q996-m~ prepare ~ evaluation 0'epo~ [reoog~] which shall be submitted with the <br />~q996~ MPCA Annual fR-epor~ [Repons], <br /> <br />(10) Heavy. Metal Contamination Feasibility Study. If heavy metal concentrations in <br />groundwater and surface water exceed regulatory standards, the Landfill will be required <br />to conduct a Feasibility Study and submit it to City staff {by Ma~ ;, |9D7} f_on schedule <br />determined by City staffl. <br /> <br />(11) Construction Quality Assurance Reports. A Construction Quality Assurance <br />(CQA) R~ort shall bc submitted to the City prior to the placement of waste on newly <br />constructed lined areas. A CQA report shall also be submitted for Landfill areas which <br />receive final cover. The report shall demonstrate that thc work is completed to the plan <br />specifications. The Report shall bc certified by an engineer registered in the State of <br />Minnesota and shall include but not be limited to: <br /> <br />(a) All relevant construction specifications; <br /> <br />(b) All shop drawings for prefabricated components; <br /> <br />(c) Photo documentation of all critical aspects of construction; <br /> <br />(d) Deflection testing results for leachate collection and transmission pipes; <br /> <br />(e) <br /> <br />Narrative description of all as-built variances from the plans and/or <br />specifications; <br /> <br />(f) As-built cross-sections of the liner subgrade; <br /> <br />(g) <br /> <br />As-built elevations for all pipe inlets and outlets and pump-on/pump-off <br />controls; <br /> <br />(h) Completed manufacturer warranties; <br /> <br />~09S79,3 7, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.