Laserfiche WebLink
Sent by: DRB 6122919313; 05/12/97 19:09; JefJrax #243;Page 27/39 <br /> <br />4.) Specific Addil~iqn~l OperaTiomtl Requiremen[s. <br /> <br />(01) i i Pi ,~L_, ........... ,__:__ p;p <br /> <br />'Pe~itt~ s~ll vefi~ to ~he City eve~ four (4) y~rs that the existing <br />[leachate_.[rapsmisfion oioes dol not leak. <br /> <br />(02) Backun l.eachate 'Pumos. Permittee shall maintain backup pumps for use in the <br />event of pump failure at the wet well and leachate storage tank on-site, or shall maintain <br />provisions for restoring temporary leachate pumping within a 24 hour period. <br /> <br />(03) Leachate Holding Tank. Permittee shall ensure that the leachate holding tank is <br />pumped out on a regular schedule, It shall be a violation of this Permit to allow leachate <br />to collect on the liner to a depth exceeding one foot due to the leachate holding tank being <br />full. <br /> <br />(04) Gas Venting System. {I,iitia;~ oW,,,t;,:,,,,:,fil,~.} [Permittee shall conductl, active <br />landfill gas venting t.~...,,~ ,,~, ~...,, ~, ,~.,, } [in accordance with aneroved nlans and <br />shall construct additional nhases of'the veminr system at the time of final cover <br />construction. ] <br /> <br />(05) Comprehensive Monitoring Plan. {Sab.,il a) rThe.._.~l Comprehensive Monitoring <br />Plan which describes the sampling frequency, parameters, protocols and reporting <br />frequency for landfill gas, leachate, leachate piezometers, leachate lysimeter, residential <br />wells, groundwater monitoring wells and surface water I'shall be undated annually t~o <br />reflect chanaes in the monitorin~ svstemsl, The monitoring plan shall yield adequate <br />information for assessing the effectiveness of the landfill gas control system in decreasing <br />VOC contaminants in the groundwater, Thet'-'--P'~,, ~,,o--'--" b,; :,uu]].,].~.~- ' "'-J b~ ."-'~,,,,.,,~ ·, <br />, ~,,, ,~,,,~ upda~.~-d ,~,,,,,,,,,y. Thc ~qts,,~ ' <br /> F,aa ,-~t annual updates shall be approved <br />by the City. <br /> <br />(06) Annual Gas Vent System Assessment. Annually assess the effectiveness ofactive <br />landfill gas venting operations based on the results of groundwater and landfill gas <br />monitoring. Incorporate the evaluation in the MPCA Annual Report for the landfill. <br /> <br />(07) VOC Remediation Feasibility Study. In accordance with MPCA {coiYeapor, doace <br />~t~ ~6 i~ai5 14, ,~ ,~,,,~ ,,~ _ ermit: Pa .C: Corr~tive Action <br />{l,i,a,xi~a;~a,i X~bo,~}, the Landfill ~ll be allowed a three ye~ lime,me in which to <br />demonstrate the effectiveness oflmdfill gas extraction system in reducing VOC <br />contamin~ts in the groundwater, <br /> <br />If, as of March l, 1999, groundwater quality standards are exceeded at the facility's <br />compliance boundary and the concentration of VOCs do not show a decreasing trend, the <br /> <br />90957~.3 6. <br /> <br /> <br />