Laserfiche WebLink
Elk River Library <br />Punch List <br />November 1, 1994 <br />Page 5 <br />13. Clean area inside fence <br />~ 14. Paint all exposed pipes and conduits <br />15. Canplete asphalt <br />Gos <br />ARCIII'I'EC'fl'Itls 16. Caulk around louver <br />17. flake out spray insulation at cooling pipe penetrations caulk to match <br />others <br />18. Caulk at door frame <br />19. Finish sign <br />20. Stripes at parking not complete (sign H.C.) <br />21. hlstall weather striping <br />Boller Room: <br />Clean <br />Paint this room? <br />Roof <br />1. Complete copper solder joints at top silocone not acceptable <br />2. Complete tie in to existing roof <br />3. Paint all roof units <br />4. Why GRV's on tall curb NRA please advise. <br />5. Roof flashing at expansion joints at corners remove silicone and solder <br />6. Broom clean roof. <br />S: \94103\I'U N CH LST.DOC <br />