Laserfiche WebLink
EIk River Library <br />Punch List <br />November 1, 1994 <br />Page 3 <br />Ceiling: Children's <br />~ Clean paint /gyp from brick at Zee wall <br />Clean gyp from wood beam <br />I;os <br />AKCIII'I'I~:C'fl'~RF. Walls: Clean gyp dust from north wall <br />Complete acoustical wall install <br />Install glass <br />Floor Seams in border not acceptable also bad at middle of area <br />Edges of carpet curling <br />Review edge treatment at threshold into common room, advise. <br />Lobby Reading /Circulation <br />Ceiling: Repair inoperative bulbs <br />Replace ceiling file at smoke detector <br />Walls: Clean brick on Zee wall paint /adhesive <br />Clean mortar at same <br />Clean gyp /paint from brick above circulation desk at soffit <br />Freestanding column -finish top with wood. <br />Clean gyp dust at brick near door to work area <br />Floor: Carpet seams not acceptable /bubbles <br />Complete carpet installation in lobby /entry <br />Casework: Install remaining wire pulls <br />Redo finish on shelves with removable stops <br />Touch-up spots in oak veeneer with light stain <br />Remove carpet adhesive from toe kick <br />Install grommet in counter top as directed <br />Install second key board tray <br />Provide proper shelf stops submitt sample top architect <br />Scratches in counter top naer check out station <br />Seam at coUcounter top not acceptable. <br />Touch-up toe kick <br />Community Room <br />Carpet: Seams and edges not acceptable <br />