Laserfiche WebLink
VIII. <br /> <br />F. Project Schedule <br /> <br />The following project schedule for Macon Street and Rivcrview Drive is based <br />upon guidelines in the Minnesota Statutes Chapter 429, Local Improvements, <br />Special Assessments. These dates may be changed as the project develops. <br /> <br />Receive Feasibility Study, Order Public Hearing, and <br />Order Plans and Specifications <br /> <br />Hold Public Hearing <br /> <br />Approve Plans and Specifications and Advertise for Bids <br /> <br />Receive Bids, Award Contract, Set Assessment <br />Hearing Date <br /> <br />Hold Assessment Hearing <br /> <br />Begin Construction <br /> <br />Complete Construction <br /> <br />First Payment with Real Estate Taxes <br /> <br />CONCLUSION <br /> <br />April 21, 1997 <br /> <br />May 5, 1997 <br />June 2, 1997 <br />July 7, 1997 <br /> <br />August 4, 1997 <br /> <br />July 1997 <br /> <br />September 1997 <br /> <br />May 1998 <br /> <br />The total estimated project cost is $490,300. As previously stated, the cost will be shared <br />between the existing lots and Outlots A and B of Country Crossing 3rd Addition. Based <br />on the information gathered and the analysis presented, the proposed improvements <br />discussed in this study are feasible from an engineering standpoint. <br /> <br />FEAS-230.365 - 14- 230-365-10 <br /> <br /> <br />