My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. SR 04-21-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
04/21/1997
>
5.8. SR 04-21-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:48 AM
Creation date
7/31/2003 8:05:36 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The southern section of Macon Street and Riverview Drive currently flow over <br />land toward the intersection. It is anticipated that drainage pattern will remain <br />unchanged. From there, the flow finds its way southerly toward the Mississippi <br />River. <br /> <br />VII. IMPLEMENTATION CONSIDERATIONS <br /> <br />Ao <br /> <br />Easements and Right of Way <br /> <br />The existing rights-of-way within the project area are 66 feet wide. These existing <br />rights-of-way should be adequate for the work proposed. Grading of existing <br />driveways and/or boulevard areas may require permission from the property <br />owners. <br /> <br />B. Permits <br /> <br />Several permits will be required prior to construction of the proposed <br />improvements. The permits that will be required are listed below: <br /> <br />Minnesota Pollution Control Agency permit for the construction of the <br />proposed sanitary sewer improvements. <br /> <br />Minnesota Department of Health permit for the construction of the <br />proposed watermain improvements. <br /> <br />Minnesota Pollution Control Agency permit for grading may be required <br />for construction. <br /> <br />Sherburne County permit for the construction of the proposed watermain <br />within County Road No. 30 right-of-way. <br /> <br />C. Estimated Costs <br /> <br />The estimated construction costs and associated overhead costs for the proposed <br />improvements are shown in Table 1. In accordance with the City's Assessment <br />Manual, the overhead costs have been estimated as 28 % of the total project cost. <br /> <br />FEAS-230.365 - 1 0- 230-365-10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.