Laserfiche WebLink
BUDGET,011097 Concept <br /> <br />NOTES: <br />NE fee nol included, as requested by TMI <br /> <br />Mass site grading provided by Owner <br /> <br />Site utililies stubbed into property <br /> <br />No paint & floor finishes in lower level <br /> <br />Lower level to upper level elevation 10'-8" assumed <br /> <br />Masonry - utility bdck allowance $1.000/M; colored rockface band and base <br /> <br />Suggest squanng off lower level to match upper level framing, maintain 5,000 sf, <br /> <br />see MP for sketch <br /> <br />Elevator included <br /> <br />Carpet in sales floor, office & break room <br /> <br />'Round" or segmented cooler is a concem, addl design development reqd.to budget <br /> <br />Extenor letters "Northbound Liquors" 24 inch height non-illuminated; for illuminated ADD $7,500 <br /> <br />Marquee, red LED reader board, 2 lines, 3' x 20', inside controller & training, incld. @ $30,000 <br />Input needed on cost of humidor & conveyors <br /> <br />Cooler- Southtown & AA Equipment not interested in budgeting <br />a curved or segmented cooler, Cadson provided $81,841 budget <br />but not involved in liquor store projects. <br /> <br />NEW ELK RIVER MUNICIPAL LIQUOR STORE Greystone Construction Co. Page 4 <br /> <br /> <br />