My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 09-20-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
09-20-2010
>
5.3. SR 09-20-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2010 1:42:14 PM
Creation date
9/17/2010 1:41:08 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tv~~~~l_~i~~.~r~s~~ L <br />Use'%:" black pipe schedule #6t) br 5!6`' "K boppeF tubing <br />from pump bypass to the vapor return valve using'1" ball <br />valve with ME~41 adaptor. <br />Cheek with local fire chief <br />before installation of unit. <br />316" "K" copper tubing frbm meter <br />Vapor eliminator to seNice valve. <br />Cabinet i§ all assembled <br />inside e>YCept scale. You <br />must assemble scale: <br />IfTlt7di`t~f1t <br />*1Nlring Faust be done: It <br />can be wired 11tl or ~4C1 <br />volts: Z417v is better bri <br />this C12 pump: If 11()v <br />is userl they must use # <br />wire up tb itldit:, #6 wire <br />Up to ~tlOft: and ##tJ' wire <br />up to 31Jtlft Thls is very <br />irnpottant foF proper <br />operation of pump. <br />Cross Channels <br />under cabinet for <br />the 2" pipes. <br />Y <br />~. <br />`V <br />Leave 6" to <br />~~~bin+?t ~~:; <br />sok of ~ j <br /> <br />50~ or 1,b00~gallon t~rtk <br />\ ~ ~- <br />\d <br />1 '~`e'' flea ctynnector llriibn Straitier 1 ~d'' ball valve 1 '/a" In ernal valve <br />ii _ <br />~. per, r !~L ~ X it ~~ 2" Schedule #4D pipe: <br />j" '~~~`~'?X~~~~~ . (GiiStbliier fiuFhishe5): Try to <br />use new pipe, it will work a <br />lot better. <br />-' l,tl icy ~°. <br />_ _ <br />Always use Teflon tape and pipe thread <br />sealant on all fiittings. Prime and paint all <br />piping as soon as passible. Liquid line <br />should be red; the rest white. <br />Try to Use a new tank with the 1 '/e" plug <br />oh one end, not In the middle: Also a new <br />tank will not have oil lying in the bottom. <br />Import~rit <br />Always make sure the <br />liquid line to pump is <br />level or has a slight <br />slope upward towards <br />tank valve - never <br />sloped up to pump. <br />' Bolt here. <br />Customer furnishes. <br />lank stands with <br />setscrews. <br />55 cable with eyetiblt; pull ring and <br />sign: Mduht where cbnvehlent grid <br />visible: Remote shutoff opposite end of <br />tank from cabinet end. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.