My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 09-20-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
09-20-2010
>
5.3. SR 09-20-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2010 1:42:14 PM
Creation date
9/17/2010 1:41:08 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mate <br /> ~ttaC~ed <br /> ire-lot <br /> ~iulk Tank Location <br /> ' <br />' <br /> Requires S <br />x ?~ <br />(appro~) total space <br /> intI~tding Ctasl~ Pflsts <br />~1 <br />V I~caced closest tt~ the biuIdir~g (#~°) <br /> agd tie front mate. <br /> <br /> <br /> ~ppro~ 3` from fend <br /> Gate <br />?5` from tl-e building -all <br />During this process you may also need to temporally move the gates from <br />against the building so the electrical conduit can be run. <br />Once the work is complete the gates can be put back where they were. <br />After the crash post and electrical work is complete no additional work will be <br />done for approximately 2-3 weeks when the dispensing unit is delivered. At that <br />point a crew will set the tank and dispensing unit and connect the electrical work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.