Laserfiche WebLink
,< <br />~t <br />_; <br />;~ <br />_~C <br />`E <br />~' <br />pveralt Preliminary host Estimate <br /> <br />Item <br />Qescriiption <br />Unit <br />aty . __~_ ., <br />Unit Gast <br />Tatal Cnst <br />SfTF WQRK $ 150,OOfl.Ofl <br />Mobilization <br />LS <br />1 <br />$ 100,000.00 <br />$ 100,000.00 <br /> Stakin and La out LS 1 $ 5D,000.00 $ 50,000.00 <br /> <br /> <br />BC.1lLDlNGS $ 4,554,000.00 <br />Renovate Research Center <br />t_S <br />1 <br />$ 100,000.00 <br />$ ~ 00,000.00 <br /> Commercial Bld SF 52,000 $ 80.00 $ 4,1 fi0,000.00 <br /> Overlook EA 5 $ 50,000.00 $ 25D,000.00 <br /> Trailhead EA 2 $ 20,000.00 $ 40,000.00 <br /> <br />f-fRRDSCAPE $ 1,900,2flfl.fl0 <br />8' Wide A -Lime Trail <br />CY <br />2200 <br />$ 10.00 <br />$ 22,OOO.OD <br /> Drivewa SF 168000 $ 5.00 $ 840,000.00 <br /> Parkin SF 89600 $ 5.00 $ 448,000.00 <br /> Concrete Pavement SF 10000 $ 6.00 $ 60,000.00 <br /> 8' wide Bit. Trail SF 67200 $ 3.50 $ 235,20Q.00 <br /> Pedestrian Li htin EA 40 $ 3,D00.00 $ 120,000.00 <br /> Street Li htin EA 10 $ 7,500.00 $ 75,000.00 <br /> Misceiieanous LS 1 $ 100,000.00 $ 100,000.00 <br /> <br />SOF?'SCAPE <br />Zone A <br />Zone B <br />Zone C <br />Zone D <br />Miscellaneous $ 535,0(30.00 <br /> <br /> <br /> <br />"Bare Root and 5' Ht Ever reen <br />AC <br />AC <br />AC <br />EA <br />LS <br />85 <br />70 <br />35 <br />2000 <br />1 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ . 75.00 <br />$ 100,000.00 <br />$ 127,500.00 <br />$ 105,000.00 <br />$ 52,500.00 <br />$ 150,000.00 <br />$ 100,000.00 <br />C7..., A~ ~n~ ~c! ~3(1C17 <br />Subtotal $ 7,135,2flfl.00 <br />SoftCOS# (10%) $ 713,520.fl0 <br />Tota( $ 7,848,720.00 <br />Contingency (20°/a) $ 1,427,040.00 <br />Grand Total $ 9,275,7fifl>00 <br /> <br />Elk RiE•er Landtilt End ltse Master Ptan <br />~itaste Atanage~ent. tnr. <br />30 <br />t~~ RS <br />September 2D02 <br />