Laserfiche WebLink
i ~, <br />B. Pro,~ect Cost <br />The project costs presented here are preliminary costs and are based on the park elements <br />illustrated in the master plan. This preliminary costs are intended to serve as a general <br />guide to overall park redevelopment and will need to be updated as more specific plans <br />and specifications available. <br />The preliminary cost estimates are provided in t~vo versions -- the overall preliminary cost <br />and each of the six phasing cost estimates. <br />t <br />t°: <br />-,~ EIk Rii•er Landfill End Use 1laster Pian ~~ ~~~ <br />!!'rite ?Management, Inc. September 2f~Z <br />