My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6. SPSR 09-03-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Site Plan Review
>
2010
>
09-08-2010
>
6. SPSR 09-03-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2010 11:58:01 AM
Creation date
9/3/2010 11:54:40 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.) Appearance and screening: <br />All equipment will be kept operational. Abandoned equipment and <br />rubbish will be periodically removed from the site. Within 3 months after <br />termination of mining, or within 3 months after termination of the <br />extraction license, all buildings and structures incidental to extraction <br />operations will be removed. The site will be graded in accordance with <br />the reclamation plan. <br />The perimeter of the site is setback from U.S. Highway 169, and the site <br />is screened from the highway by existing properties. There are a few <br />rural residences located in the vicinity. The site is screened from these <br />structures by wooded areas. Berms will be constructed from topsoil <br />stripped from areas to be mined. These berms will be placed as <br />appropriate within setback areas to provide additional screening from <br />adjacent residential structures. <br />Wooded areas within setbacks will be preserved to the maximum extent <br />feasible. <br />5.) Operating Standards: <br />a. Noise: <br />i <br /> <br /> <br /> <br />The mining operation will be operated in compliance with all State <br />noise standards. <br />b. Hours: <br />Mining and processing will be conducted between 7:00 a.m. to 7:00 <br />p.m. Monday -Saturday. <br />c. Explosives: <br />Explosives will not be used at this site. <br />d. Fugitive dust: <br /> <br /> <br /> <br /> <br /> <br />Fugitive dust will be minimized by applying appropriate dust control <br />to the access road and the use of conveyors. Internal haul roads will <br />be watered as needed. <br />e. Water Pollution: <br />The site will operate in compliance with all applicable Minnesota <br />Pollution Control Agency and Department of Natural Resources <br />Tiller Corporation <br />Conditional Use Permit Application <br />August 30, 2010 <br />Page X11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.