Laserfiche WebLink
Attachment D-10/12106. <br />contract would receive 100% federal funds. If the right-of-way or soft match is less than 25% then some state <br />or local match would be required. The following examples assume an 80!20 participation. <br />Soft Match Example for Enhancement Projects <br /> <br />Contract Cost $100,000 $100,000 $100,000 <br />ROW or Soft Match 25,000 40,000 20,000 <br />Total Pro~ect Cost $125,000 $140,000 $120,000 <br />Federal Share 80% of $100 <br />000 000 <br />$112 $96 <br />000 <br />Total , , , <br />Additional State-Local $ 0 $ 0 $ 4 <br />000 <br />res onsibilit , <br />In Example A and B, no local or state match is required as 80% is equal to or greater than the contract cost. <br />Federal funds used would be $100,000. Example C illustrates that a local or state match would be required as <br />80% is less than the contract amount. Federal funds used would equal $96,000. <br />C1 <br />