My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. SR 06-21-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
06-21-2010
>
5.8. SR 06-21-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2010 3:28:38 PM
Creation date
6/18/2010 2:39:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEVELOPMENT CHARACTER <br />• <br />THE PINNACLE <br />~ The Pinnacle sub-area is <br />L._, <br />the narrow, under- <br />-'__i utilized area in the far <br />northwest of the study <br />,~ , <br />~` area between the rail <br />- ~ -! line and Highway 1o~16g. <br />Access is challenging for <br />much of the site, but an <br />opportunity exists with strong highway <br />visibility. The timing of access changes <br />along Highway 10169 will have large <br />effect on development and redevelopment <br />in this district. <br />NEAR-TERM <br />With limited access and numerous small <br />parcels it is unlikely major redevelopment <br />will occur in this sub-area in the near- <br />term. Rather, capitalizing on recent <br />• investments with the extension of <br />Vance Avenue, select small industrial <br />users with limited access needs and <br />relatively limited investment fit for the <br />undeveloped portion of the district. <br />Redevelopment of the two vacant sites <br />north of 73rd Avenue could allow for <br />office or office showroom uses, however, <br />a median crossing will be closed at 173rd <br />Avenue with the planned zo13 MN DOT <br />resurfacing project could impact any high <br />trafFic uses. <br />fir'. <br />~_ Ir"U BUIIDIHC <br />Y®-~7 PAfiKING <br />-_ o eau' x~o awu <br />` ~ ~~ <br />E ~ <br />.. <br />ieN <br />~~ <br />The frontage road will remain as the 7hePinnaclesubArea-Near7ermVignetteStudy <br />primary access for uses along Highway <br />1 o~16g, but the intersection at 173rd create attractive building fronts and organizing the development pattern. The <br />Avenue should be reconstructed further organization must include well landscaped parking to the front or side of the <br />east with any redevelopment for building, and well screened loading and storage areas located behind the buildings. <br />additional safety measures. Extending Stormwater treatment can take on an entire sub-area approach and become <br />Vance Avenue to the frontage road and internal to the larger blocks of development. This framework of streets, utilities and <br />the addition of district signage icons will Stormwater treatment sets the stage for broader long term redevelopment which <br />help increase visibility for small business could occur with an additional access to the north. <br />behind the frontage road users. As these <br />t.-~~~ses evolve, steps should be taken to <br />~: _~ <br />17130 <br />QV2r1U@ Focused Area STud <br />52 <br />x <br />. <br />; <br />y <br />; <br />
The URL can be used to link to this page
Your browser does not support the video tag.