Laserfiche WebLink
Ms Rebecca Haug <br />May 6, 2010 <br />Page 3 of 3 <br />presented with the request do not show the construction of P2 and are not consistent with the <br />calculations. Revised surface water calculations for P2 must be modified to include the appropriate <br />portion of runoff from the area of uncontrolled drainage of the Cell 1$ fugal cover slope (as indicated <br />above). <br />Please contact me if you have any questions or continents regarding my review of the ERL request far <br />amendment of the License/CUP. <br />Sincerely, <br />mar n lr 1 ental, LLC _..- <br />Matthew L. Ledvina, P.E. <br />Project Engineer <br />F:\PROJECTS\CER-City of Elk River\2009-07.01\Corr\Letters 2010\It100506Haug.doc <br />