My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 06-21-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
06-21-2010
>
5.3. SR 06-21-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2010 3:26:20 PM
Creation date
6/18/2010 2:22:31 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms Rebecca Haug <br />May 6, 2010 <br />Page 3 of 3 <br />presented with the request do not show the construction of P2 and are not consistent with the <br />calculations. Revised surface water calculations for P2 must be modified to include the appropriate <br />portion of runoff from the area of uncontrolled drainage of the Cell 1$ fugal cover slope (as indicated <br />above). <br />Please contact me if you have any questions or continents regarding my review of the ERL request far <br />amendment of the License/CUP. <br />Sincerely, <br />mar n lr 1 ental, LLC _..- <br />Matthew L. Ledvina, P.E. <br />Project Engineer <br />F:\PROJECTS\CER-City of Elk River\2009-07.01\Corr\Letters 2010\It100506Haug.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.