My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 06-21-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
06-21-2010
>
5.3. SR 06-21-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2010 3:26:20 PM
Creation date
6/18/2010 2:22:31 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a.~ <br />Ms Rebecca Haug <br />May 6, 2010 <br />Page 2 of 3 <br />design. Basegrades are acceptably configured with sufficient vertical separation from the gl•oundwater <br />elevation based on historic monitoring data. The liner system and final cover system designs are <br />acceptable and consistent with previous approvals. <br />The design is missing engineering and construction details related to the leachate management system <br />and other features. The detailed engineeruig design report and construction plans must provide <br />hydraulic calculations for Cell 18 ni relation to the existing leachate management infrastructure to <br />demonstrate sufficient capacity for the added liner area. It is recommended that the CUP and License <br />contain conditions requiring the submittal and staff approval of the detailed engineering reports and <br />construction plans prior to Cell 18 construction. <br />Page 3-6 Gradin /Dg rainage Plan and Drainage Calculations <br />The conceptual surface water drainage plan is generally acceptable; however modifications are <br />necessary to meet standard landfill design guidelines. <br />The application states that all of the stonnwater is controlled onsite, however, surface water drainage for <br />approximately 4 acres of landfill slope is uncontrolled on the south side of Cell 18. Surface water is <br />currently designed to sheet flow over the perimeter access road and then offsite to the property to the <br />south. Significant erosion is anticipated for the steep exterior berm slopes which are proposed at a 2:1 <br />ratio. The perimeter access road needs to be redesigned to include au interior ditch with sufficient <br />hydraulic capacity and erosion control protection. Surface water should be routed to Pond P2 or other <br />provisions made if sufficient capacity for P2 is not available. An additional surface water pond may <br />need to be established at an offsite location considering that no buffer is provided adjacent to the south <br />fill limit of Cell 18. <br />Page 3-9 Leachate and Gas Collection S, std ern, pa eg 310 <br />ERL proposes leachate recirculation for Cell 18. This operation will greatly increase the amount of <br />landfill gas tlTat will be generated from the landfill. The prunary concerns relate to landfill gas <br />collection and the prevention of fugitive gas emissions and odors. <br />To provide additional LFG extraction capacity, the design must be modified to place horizontal LFG <br />collection piping within the sand drainage layer at the east west ridge (high point} of the Celi 18 liner <br />system. The supplemental LFG collection piping must extend up the sideslopes to enable corniection to <br />the LFG extraction system and to enable cleanout maintenance. <br />Temporary final cover is proposed as an element of the September 2008 "Leachate Recirculation Permit <br />Application'' proposal. The criteria for when an area would receive temporary final cover indicating the <br />maximum length of time of inactive fill operations needs to be identified. Similarly, the maximum area <br />allowed for inactive fill areas prior to placing temporary final cover need to be identified by the <br />applicant. <br />Page 3-10 Construction Quality Assurance Reports <br />ERL must prepare detailed record drawings/documents of the leachate recirculation drainfield <br />construction, which are certified by an engineer. The drawings will include survey measurements of the <br />drainfield areas to document position witlun the cell, suitable base contours and piping elevations. All <br />construction must be fully documented. This information is critical in potential problem resolution <br />during later stages of landfill operation. <br />ApUendix B Grading and Drainage Calculation <br />The sedimentation basin design information for P2 indicates a total storage capacity of 8.7 ac-ft. From <br />the plans submitted, the current capacity of P2 is approximately 1 ac-ft or less. The design plans <br />
The URL can be used to link to this page
Your browser does not support the video tag.