My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. PCSR 06-08-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2010
>
06-08-2010
>
5.6. PCSR 06-08-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2010 11:00:21 AM
Creation date
6/4/2010 3:30:40 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />concePC eva~uac~on <br />~Continuin the evolution from the Phase One study, the Phase Two concept evaluation <br />g <br />began with an exercise in determining the final stage of the infrastructure and <br />transportation network for the study area. This focused the planning horizon and <br />assisted in creating an approach for near-term, interim and long-term land use <br />and transportation solutions for the study are to be further refined. Four concept <br />alternatives were then explored for the ~7~st Avenue FAST, each with a different <br />focus for land use, particularly from the rail line west to the river. Uses ranging from <br />housing to industrial and business park uses along with commercial and retail uses <br />were evaluated in conjunction with alternatives for the future interchange location <br />and consequent local roadway network. Lastly, detailed options for an interim second <br />signalized intersection and future interchange location were created to better assess <br />the impacts to private property, natural features and broad cost comparisons. <br /> <br />i <br /> <br /> <br />r <br />~~ <br />~ __ <br /> <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.