Laserfiche WebLink
PRELIMINARY COST ESTIMATE June, 2010 <br />2010 STREET OVERLAY IMPROVEMENTS <br />CITY OF ELK RIVER, MINNESOTA <br />BMI PROJECT NO.: 816.102234 <br />ITEM APPROX. UNIT <br />NO. ITEM QUANT. UNIT PRICE AMOUNT <br />20 SOD; TYPE LAWN 2000 SY $3.50 $7;000.00 <br />21 PROTECT PRIVATE SPRINKLER SYSTEMS 1 LS $1;500.00 $1,500.00 <br />22 ADJUST EXISTING CASTING 10 EA $250.00 $2;500.00 <br />23 RE-GRADE DRAINAGE SWALE 1 LS $2,500.00 $2,500.00 <br />24 INSTALL NEW GATEVALVE BOX (TOP SECTION) 8 EA $300.00 $2;400.00 <br /> TOTAL ESTIMATED CONSTRUCTION COST: $244,260.00 <br /> PROJECT OVERHEAD (10%): $24;426.00 <br />TOTAL ESTIMATED COST FOR PROJECT AREA 3: $268,686.00 <br />PROJECT AREA 4 <br />1 MOBILIZATION 1 LS $2,000.00 $2.000.00 <br />2 TRAFFIC CONTROL 1 LS $500.00 $500.00 <br />3 EDGE MILL BITUMINOUS SURFACE AT DRIVEWAY 375 LF $4.00 $1;500.00 <br />4 AGGREGATE SHOULDERING (CV) 150 CY $16.00 $2,400.00 <br />5 AGGREGATE SURFACING (CV), DRIVEWAY 5 CY $18.00 $90.00 <br />6 3" - .5" TYPE MV NON-WEARING COURSE MIXTURE 75 TON $58.00 $4;350.00 <br />7 1.5" TYPE MV WEARING COURSE MIXTURE 800 TON $50.00 $40;000.00 <br />8 BITUMINOUS TACK COAT 475 GAL $3.00 $1;425.00 <br /> TOTAL ESTIMATED CONSTRUCTION COST: $52;265.00 <br /> PROJECT OVERHEAD (10%): $5;226.50 <br /> TOTAL ESTIMATED COST FOR PROJECT AREA 4: $57,491.50 <br />TOTAL ESTIMATED PROJECT COST -AREAS 1, 2, 4: <br />TOTAL ESTIMATED PROJECT COST -AREA 3: <br />TOTAL COSTS ALL PROJECTS: <br />$470,002.50 <br />$268,686.00 <br />$738,688.50 <br />Appendix Exhibit 1 <br />