My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 06-07-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
06-07-2010
>
5.6. SR 06-07-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2010 10:35:34 AM
Creation date
6/4/2010 3:16:16 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/7/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY COST ESTIMATE June, 2010 <br />2010 STREET OVERLAY IMPROVEMENTS <br />CITY OF ELK RIVER, MINNESOTA <br />BMI PROJECT NO.: 816.102234 <br />ITEM APPROX. UNIT <br />NO. ITEM QUANT. UNIT PRICE AMOUNT <br />20 SOD; TYPE LAWN 2000 SY $3.50 $7;000.00 <br />21 PROTECT PRIVATE SPRINKLER SYSTEMS 1 LS $1;500.00 $1,500.00 <br />22 ADJUST EXISTING CASTING 10 EA $250.00 $2;500.00 <br />23 RE-GRADE DRAINAGE SWALE 1 LS $2,500.00 $2,500.00 <br />24 INSTALL NEW GATEVALVE BOX (TOP SECTION) 8 EA $300.00 $2;400.00 <br /> TOTAL ESTIMATED CONSTRUCTION COST: $244,260.00 <br /> PROJECT OVERHEAD (10%): $24;426.00 <br />TOTAL ESTIMATED COST FOR PROJECT AREA 3: $268,686.00 <br />PROJECT AREA 4 <br />1 MOBILIZATION 1 LS $2,000.00 $2.000.00 <br />2 TRAFFIC CONTROL 1 LS $500.00 $500.00 <br />3 EDGE MILL BITUMINOUS SURFACE AT DRIVEWAY 375 LF $4.00 $1;500.00 <br />4 AGGREGATE SHOULDERING (CV) 150 CY $16.00 $2,400.00 <br />5 AGGREGATE SURFACING (CV), DRIVEWAY 5 CY $18.00 $90.00 <br />6 3" - .5" TYPE MV NON-WEARING COURSE MIXTURE 75 TON $58.00 $4;350.00 <br />7 1.5" TYPE MV WEARING COURSE MIXTURE 800 TON $50.00 $40;000.00 <br />8 BITUMINOUS TACK COAT 475 GAL $3.00 $1;425.00 <br /> TOTAL ESTIMATED CONSTRUCTION COST: $52;265.00 <br /> PROJECT OVERHEAD (10%): $5;226.50 <br /> TOTAL ESTIMATED COST FOR PROJECT AREA 4: $57,491.50 <br />TOTAL ESTIMATED PROJECT COST -AREAS 1, 2, 4: <br />TOTAL ESTIMATED PROJECT COST -AREA 3: <br />TOTAL COSTS ALL PROJECTS: <br />$470,002.50 <br />$268,686.00 <br />$738,688.50 <br />Appendix Exhibit 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.