Laserfiche WebLink
• TAW A <br />"1995 Building and Zoning Proposed Fee Changes" <br />ITEM 1995 FEE PROPOSED 1996 FEE <br />1) Building Permits UBC Table 3A + 65% Plan Check + State Commercial <br />Surcharge (Residential and Commercial) UBC Table 1A + 65% Plan Check + <br />State Surcharge <br />Residential <br />UBC Table 1A + 35% Plan Check + <br />State Surcharge <br />Example: $100,000 House= $1,105.50 Building Example: $100,000 House = $1,258.00 <br />Permit Fee (Not Including SAC) Building Permit Fee (Not including SAC) <br />2) Heating,Ventilation, and Permit Fee: $0 Permit Fee: 1% of Valuation of Work Plus <br />Air Conditioning State Surcharge <br />3) Miscellaneous Building Permits <br />A. Decks Flat Fee: $35.00 + State Surcharge <br />Example: <br />loft X loft Deck = $35.50 Permit Fee <br />20ft X 14ft Deck = $35.50 Permit Fee <br />B. Garages, Basement Finishes Flat Fee: $45.00 = State Surcharge <br />Example: <br />22ft. X 20ft. Garage = $47.00 Permit Fee <br />C. Re -Roofs Residential: Flat Fee <br />$25.00 + State Surcharge <br />Commercial: Valuation Calculated by Contractor <br />D. Removing Building Flat Fee: $50.00 <br />Valuation Calculated by $8.00 /Sq. Ft. + <br />State Surcharge <br />Example: <br />loft X loft Deck = $30.75 Permit Fee <br />20ft X 14ft Deck = $76.50 Permit Fee <br />Valuation Calculated by $10 /Sq. Ft. + <br />State Surcharge <br />Example: <br />22ft. X 20ft. Garage = $115.50 Permit Fee <br />Residential: Flat Fee <br />$35.00 + State Surcharge <br />Commercial: Valuation Calculated by <br />$ .50 /Sq. Ft. <br />Flat Fee: $35.00 + $25.00 Street Disruption <br />Permit if Applicable <br />Note: Fence, fireplace, swimming pool, moving house in, and 3- season porch permits are proposed to remain the same. 3- season <br />porch permits were already calculated using a valuation based on square footage. Detached accessory structure permits are <br />proposed to be the same as garage permits. <br />4) Mineral Excavation Licenses $15.00 /Acre- Approved to be Mined $20.00 /Acre- Approved to be Mined <br />$ 5.00 /Acre- Mined and not Reclaimed $10.00 /Acre- Mined and not Reclaimed <br />