Laserfiche WebLink
I <br />k • <br />River <br />TO: <br />FROM: <br />DATE: <br />MEMORANDUM <br />Planning Commission <br />Steven B. Ach, City Planner–lve&417— <br />September 26, 1995 <br />SUBJECT: Conditional Use Permit Request by <br />Novco, Inc., Public Hearing Case <br />No. CU 95 -23 <br />Request <br />ITEM 5.10. <br />Novco, Inc. is requesting a conditional use permit to construct a second <br />principal structure and operate a truck terminal on an industrial lot in Rail <br />10 Industrial Park. <br />Location <br />Lot 4 Block 1, Rail 10 Subdivision (17230 Ulysses Street). <br />Zoning/Land Use <br />I -1 (Light Industrial) / L -I (Light Industrial) <br />Attachments <br />• Location Map <br />• Zoning Map <br />• Exhibit A (approved site plan) <br />• Exhibit B (proposed site plan) <br />• Excerpt from Performance Standards <br />Backaroand <br />Novco, Inc. originally constructed a 2,560 square foot building in 1993 for the <br />sole purpose of storing a couple of trucks. In order to construct this building, <br />Novco was required to go through a site plan review process prior to receiving <br />a building permit. Attached is Exhibit A illustrating the plan that was <br />approved on November 10, 1993. The proposed site plan illustrating the <br />second accessory building is attached and labeled Exhibit B. <br />13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (61 2) 441 -7420 • Fax: (61 2) 441 -7425 <br />