Laserfiche WebLink
Page 3 <br />3. Additional information be provided to the building department <br />• verifying the location of the existing septic system, assuring staff that <br />there will be no conflicts of the proposed building in the existing <br />system. <br />• <br />is <br />4. The building official and fire chief perform an inspection of the existing <br />building to determine if all codes are met relative to the existing use of <br />the building and outdoor storage tanks. <br />5. Four sets of revised site plans reflecting conditions of approval be <br />submitted for staff review and approval prior to issuance of a building <br />permit. <br />Recommendation <br />Staff concurs with the Planning Commission recommendation to approve the <br />conditional use permit for Novco, Inc. <br />s:counciUCU95 -23 <br />