My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6. SR 10-30-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
10-30-1995 SP
>
6. SR 10-30-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2010 8:33:03 AM
Creation date
6/2/2010 8:33:02 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/30/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~a <br />~Ik Ri <br />ITEM 6. <br />MEMORANDUM <br />ver TO: <br />FROM: <br />DATE: <br />SUBJECT: <br />Mayor & City Council <br />Pat Klaers, City 's ator <br />October 30, 199 <br />East Elk River runk Sewer and Water <br />Project <br />Most of the evening of October 30, 1995, is scheduled as another in a series of <br />Council worksessions on the extension of trunk sewer and water utilities to <br />the east Elk River area. Attached for your review are the minutes from the <br />last two worksessions on this project. These minutes are from the 7/31/95 <br />and 9/25/95 meetings. <br />A stated goal of the Council is to get public input on this project. Number 7 <br />in the outline for the 10/30 meeting shows this public meeting being planned <br />for fall or winter. The purpose of going to the public for either a public <br />hearing or a public informational meeting is to gauge the response from the <br />• property owners on the desire or demand for public utilities. Typically <br />property owners cannot provide this kind of feedback until they know a lot of <br />details about the project including their cost for the project and the timing of <br />the project. If the Council wants to have some of this information available <br />before a public meeting, then the Council will have to make some important <br />decisions about the project. The other alternative is to go to the public in a <br />very general manner and simply indicate that trunk utilities are coming, but <br />that we as a city do not know when or at what exact cost to the property <br />owner. In this manner we may get some general feedback from the property <br />owners on the desirability of the project. <br />Some of the specifics that property owners will want to have answered at a <br />public meeting may include the following: <br />• The total project area (east Elk River ultimate sewer and water <br />district) <br />• Phase I project area <br />• The assessment method...one rate for everyone or one rate per <br />zoning district and what will happen if zoning districts change. <br />(For a variety of reasons, staff will be recommending one rate for all <br />properties. This is the same approach that is being used in the <br />• western area) <br />13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.