My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 10-30-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
10-30-1995 SP
>
5.1. SR 10-30-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2010 8:28:31 AM
Creation date
6/2/2010 8:28:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/30/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
73963 <br />• contractor for the Joplin Street construction must be approved in <br />writing by the State District Engineer's authorized representative. <br />Section E. Comvliance with Laws, Ordinances and Regulations <br />The City shall, in connection with the award and administration of <br />the construction contract and the performance of the contract <br />construction, comply and cause its contractor to comply with all <br />Federal, State and Local laws, including Minnesota Statutes. <br />Section 16B.101 (1994), and all applicable ordinances and <br />regulations. <br />Section F. Right-of-Wav, Easements and Permits <br />The City shall, without cost or expense to the State, obtain all <br />rights-of-way, easements, construction permits and/or .any other <br />permits and sanctions that may be required in connection with the. <br />contract construction, and shall promptly furnish the State with <br />certified copies of the documents for those rights-of-way, easements, <br />• construction permits and/or other permits and sanctions required for <br />trunk highway construction. <br />ARTICLE II - PAYMENT BY THE STATE <br />The State shall advance to the City, as the State's full and complete <br />share of the costs of the Joplin Street construction and associated <br />construction engineering to be performed between Trunk Highway No. 10 <br />and Business Center Drive within the corporate City limits under <br />State Project No. 7102-87 (T.H. 10=003), a lump sum in the amount of <br />$32,417.59. <br />The State shall advance to the City the lump sum amount after the <br />following conditions have been met: <br />A. Encumbrance by the State of the State's full and complete lump <br />sum cost share. <br />• <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.