Laserfiche WebLink
73963 <br />• contractor for the Joplin Street construction must be approved in <br />writing by the State District Engineer's authorized representative. <br />Section E. Comvliance with Laws, Ordinances and Regulations <br />The City shall, in connection with the award and administration of <br />the construction contract and the performance of the contract <br />construction, comply and cause its contractor to comply with all <br />Federal, State and Local laws, including Minnesota Statutes. <br />Section 16B.101 (1994), and all applicable ordinances and <br />regulations. <br />Section F. Right-of-Wav, Easements and Permits <br />The City shall, without cost or expense to the State, obtain all <br />rights-of-way, easements, construction permits and/or .any other <br />permits and sanctions that may be required in connection with the. <br />contract construction, and shall promptly furnish the State with <br />certified copies of the documents for those rights-of-way, easements, <br />• construction permits and/or other permits and sanctions required for <br />trunk highway construction. <br />ARTICLE II - PAYMENT BY THE STATE <br />The State shall advance to the City, as the State's full and complete <br />share of the costs of the Joplin Street construction and associated <br />construction engineering to be performed between Trunk Highway No. 10 <br />and Business Center Drive within the corporate City limits under <br />State Project No. 7102-87 (T.H. 10=003), a lump sum in the amount of <br />$32,417.59. <br />The State shall advance to the City the lump sum amount after the <br />following conditions have been met: <br />A. Encumbrance by the State of the State's full and complete lump <br />sum cost share. <br />• <br />4 <br />