My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 10-30-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
10-30-1995 SP
>
5.1. SR 10-30-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2010 8:28:31 AM
Creation date
6/2/2010 8:28:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/30/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
73963 <br />specifications and/or special provisions designated by the City as <br />Western Area Phase II Sanitary Sewer, Watermain and Street <br />Improvements. Execution of this agreement shall constitute <br />concurrence by the State in that award. The contract construction <br />shall be performed in accordance with City plans, specifications <br />and/or special .provisions which are on file in the office of the <br />City's Engineer, and are made a part hereof by reference with the <br />same force and effect as though fully set forth herein. <br />Section B. Direct_on~__Supervision and Inspection of Construction <br />The contract construction shall be under the direction of the City <br />and under the supervision of a registered professional engineer; <br />however, the contract construction shall be open to inspection by the <br />State's District Engineer at Brainerd or his authorized <br />representatives. <br />Responsibility for <br />construction .shall <br />carried out in aca <br />including No. 1609 <br />Specifications for <br />the control of materials for the contract <br />be on the City and its contractor and shall be <br />~rdance with Specifications No. 1601 through and <br />as set forth in the State's current "Standard <br />Construction". <br />Section C. Completion of Construction <br />The City shall cause the contract construction to be started and <br />completed in accordance with the time schedule in the construction <br />contract special provisions. The completion date for the contract <br />construction may be extended, by an exchange of letters between the <br />appropriate City official and the State District Engineer's <br />authorized representative, for unavoidable delays encountered in the <br />performance thereof. <br />Section D. Plan Changes, Etc. <br />All changes in the plans, specifications and/or special provisions <br />for the Joplin Street construction and all addenda, change orders <br />• and/or supplemental agreements entered into by the City and its <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.