My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.6.A. SR 06-16-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
06-16-2008
>
3.6.A. SR 06-16-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2008 10:33:25 AM
Creation date
6/13/2008 10:32:37 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />To Item Number <br />Ci Council 3.6.A. <br />Agenda Section Meeting Date Prepared by <br />Communi Develo ment une 16, 2008 erem Barnhart, Plannin Mana er <br />Item Description Reviewed by <br />Request by Quent Nelson of Hometown Fireworks for General <br />Planning Permit -Temporary Sales Tent for Fireworks Case Reviewed by <br />No. GP 08-07 <br />Action Requested <br />Approval of the General Planning Permit request for temporary fireworks sales in a 1,200 square foot <br />tent on a grass area of 18130 Zane Street as indicated on the site plan, with the conditions outlined in this <br />report: <br />1. No electrical services shall be across any drive or walking surface. <br />2. All applicable fire codes shall be met. <br />3. If traffic becomes a problem around the temporary site as determined by the Police <br />Chief or his designee, the sales area shall be delineated with a barrier to restrict traffic. <br />4. The sales tent be maintained free of debris and kept in an orderly condition. <br />5. The location of the tent is consistent with the submitted site plan dated June 16, 2008. <br />6. The tent area shall be removed by July 9, 2008, and the site returned to its previous <br />condition. <br />7. The area inside and within 25 feet of the tent shall be mowed per Fire Chiefs <br />requirements. <br />Background/Discussion <br />Quent Nelson, on behalf of Hometown Fireworks, is seeking approval to operate the facility June 20 to <br />July 5, 2008; however, the tent may be set up a couple days prior to the sales starting. The tent would be <br />located on a grassy area. It appears that in this location the tent will not disrupt traffic flow nor will it <br />create any parking problems. The Fire Chief, in his review, is requiring the grass in and within 25 feet of <br />the tent to be mowed. Parking is available to the north; no parking will be available at any time on Zane <br />Street to the east. <br />Attachments <br />• Aerial photo <br />Action Motion by Second by Vote <br />Follow Up <br />S:\PLANNING MAIN\Case Files\GP\GP 08-07 Quent Nelson\CC report 6-16-08 Quent Nelson.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.