My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 04-16-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
04/16/2007
>
5.2. SR 04-16-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:50 AM
Creation date
4/13/2007 10:32:27 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/16/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />ITEM 5.2. <br /> <br />MEMORANDUM <br /> <br />TO: Mayor & City Council <br /> <br />FROM: Rebecca Haug, Environmental Administrator <br /> <br />DATE: April 16, 2007 <br />SUBJECT: 2006 NPDES Permit Update <br /> <br />The City of Elk River was required by the Minnesota Pollution Control Agency (MPCA) <br />to apply for the National Pollutant Discharge Elimination System (NPDES) General <br />Storm Water Permit by March 10,2003. A requirement of the permit is to hold public <br />meetings such as this, every year. <br /> <br />The permit requires the city to develop and implement Best Management Practices <br />(BMPs) and achieve measurable goals to satisfy six minimum control measures. The six <br />goals are Public Education and Outreach; Public ParticipationlInvolvement; Illicit <br />Discharge Detection and Elimination; Construction Site Runoff Control; Post <br />Construction Runoff Control; and Pollution Prevention/Good Housekeeping. <br /> <br />The City was able to meet goals in each of the six measures. Some examples are: <br /> <br />I. Storm Water Survey to all residents <br />2. Website link for storm water related information <br />3. Continuance of licensing lawn care professionals <br />4. Inspections of plats to ensure erosion control measures are being taken <br />5. Inspections of storm drains (20% required each year) <br />6. Frozen Ground Condition Agreement <br />7. City contracted with BDM for an Erosion Control Inspector <br />8. Cooperative project with Cretex for storm water quality <br />9. Worked with Elk River Ford on constructing bio retention ponds in their <br />expansion area <br />10. Worked with the library project on designing low impact storm water <br />management <br />11. Member of the Minnesota Cities Stormwater Coalition <br /> <br />Another component of the permit is to adopt a Storm Water Ordinance. City staffhas <br />drafted a storm water ordinance and it is attached in your packet. The City currently has a <br />section in the ordinance on Erosion and Sediment Control (sec. 30-416) however; it does <br />
The URL can be used to link to this page
Your browser does not support the video tag.