My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-004 RES
ElkRiver
>
City Government
>
City Council
>
Council Resolutions
>
2000 - 2009
>
2007
>
001-025
>
07-004 RES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 3:34:14 PM
Creation date
1/25/2007 10:01:49 AM
Metadata
Fields
Template:
City Government
type
RES
date
1/2/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION 07-04 <br />MAINTENANCE AGREEMENt= 2007 <br /> <br />THIS AGREEMENT made and entered into by and between the City of Elk River hereinafter referred to <br />as the "City" and the County of Wright hereinafter referred to as the "County". <br /> <br />WHEREAS, it is deemed to the best interest of all parties that the duties and responsibilities of both the <br />City and the County as to maintenance on Bridge #86515 and its approaches should be clearly defined. <br /> <br />NOW THEREFORE, IT IS AGREED with regard to said structure maintenance: <br /> <br />MAINTENANCE <br /> <br /> <br />i <br /> <br />CITY RESPONSIBLE FOR: <br />(1) Maintenance of street lights;. <br />(2) Removal of snow from sidewalk; k)\ l \ <br />(3) Maintenance of slopes/berms and roadway on north approach (includes: turf maintenance, <br />bituminous maintenance, drainage and riprap maintenance); <br />(4) Snow and ice control from bridge and approaches; <br />(5) Removal of markings/spray paint etc. from visible surfaces of bridge structure. <br /> <br />COUNTY RESPONSIBLE FOR: <br />(1) Periodic sweeping to remove sand and debris and removing sand/dirt from expansion joints; <br />(2) Signing for bridge and approaches; <br />(3) Maintenance of slopes/berms and roadway on south approach (includes: turf maintenance, <br />bituminous maintenance, drainage and riprap maintenance); <br />(4) Centerline and edge pavement marking (includes stop bar). <br /> <br />The agreement between the City and County shall be for a one-year period and run from January 1, <br />2007, to December 31,2007. All maintenance responsibilities will be deemed "offsetting" therefore no <br />payments will be required for the individual maintenance work which conforms to the areas stated herein and <br />performed under authorization of either the City or County. <br /> <br />In the event that the structure needs major maintenancelrehabilitation an agreement detailing the work <br />and shared costs must be approved and accepted by the City and County. <br /> <br />ADOPTED: <br />::JC,^""Vd;'1-( <3 ,2001 <br /> <br />~~(? <br /> <br />City Clerk <br /> <br />~ ~~~ .' <br />MaYOr~ ~ <br /> <br />CERTIFICATION <br /> <br />I hereby certify that the above is a true and correct copy of a resolution duly passed, adopted and <br />approved by the City Council of said City on ~",^IA { "l. /7 ,20Q:L. ?,() <br /> <br />~/ M <br /> <br />City Clerk E\~ ~\ve{ <br />Name of City <br /> <br />APPROVED AND ACCEPTED: <br />COUNTY OF WRIGHT <br /> <br />Chairman of the Board <br /> <br />Date <br /> <br />ATTEST: <br /> <br />County Coordinator <br /> <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.