My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.2 SR 01-16-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
01-16-2024
>
10.2 SR 01-16-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 8:43:13 AM
Creation date
1/12/2024 8:41:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�, <br />Elk s �- <br />River <br />Request for Action <br />To Item Number <br />Ma Tor and CinT Council 10.2 <br />Agenda Section Meeting Date Prepared by <br />WoYk Session anuar�r 16, 2024 Brandon Wisner, En ineerin Pro�ect Mana eY <br />Item Description Reviewed by <br />iVlississippi Road Trail Update Cal Pormer, Ci r Administrator <br />Reviewed by <br />Action Requested <br />Provide direction to staff for the Mississippi Road Trail based on the current design. <br />Background/Discussion <br />Design of the trail connections bet�ueen the current gap areas along the north side of l��ississippi Road between <br />OYono PaYkway and Waco Street staYted this last summeY. The pYoposed trail connections are adjacent to 20 <br />properties and `vould complete the trail alignment in accordance with the approved Trails Master Plan. <br />The original design was presented to adjacent/affected pYopeYtyr owners at the October 5�' open house. Staff <br />compiled the feedback and had our consultant update the design which substantiallyT reduces the amount of <br />impact to private pYopeYties. The updated design was presented at an open house on DecembeY 13. <br />Staff `vill present the current design, explain feedback received, timeline and ask for project direction. <br />Financial Impact <br />PaYk Dedication Fund. The estimated pYoject cost will be shared when it is ready following final design. <br />Mission/Policy/Goal <br />OpportunityT to live, `vork, and p1ayT <br />Attachments <br />■ Mississippi Trail Design (original alignment in red, new alignment in green.) <br />The Elk River Vision <br />A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional <br />se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. <br />rowEREo ar <br />�I'1 ���� <br />Update�l• January 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.