My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-03-1972 TBM
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
Township Board 1907 - 1973
>
1970-1979
>
1972
>
04-03-1972 TBM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2023 8:37:14 AM
Creation date
3/3/2023 8:32:52 AM
Metadata
Fields
Template:
City Government
type
TBM
date
4/3/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ELK RIVER TOWN BOARD MEETING <br />APRIL 3, 1972 <br /> <br />The meeting was called to order by the chairman. The first order of business was a motion to <br />increase Fred Brenetsons from 14.40 to 15.50 per hour for man and equipment. Motion was <br />seconded and carried. <br /> <br />Carmen Rosenthal appeared in regard to the gun ordinance in Elk River. She would like a copy of <br />original ordinance also copy of attorney general opinion. <br /> <br />Mr. and Mrs. Lakoduk appeared before the board to show change in road. The Town Board gave <br />temporary approval to the change in the road in Harry Lakoduk plat with final approval on <br />completion of changes in filed copies of plat. Motion for preceding made by Earl Schulke seconded <br />by E. Specht. The motion carried. The Board of Supervisors got bids on culverts. They are as <br />follows H.V Johnson Co 3.30 per ft. 12” street supply of Cul Co 3.06 per ft 10700 ft Merlin Wictor <br />Glendorado 2.91 per ft. delivered. Brodholm Bros. concrete 12” 2.95 per ft. seconds 1.50 per ft if <br />available. Ordered from Merlin Wictor 6-12 ft 6-14 ft 6-16 ft. The following bills were paid. <br /> <br />Revenue Fund <br />Everett Specht 32.00 <br />DR Moldenhauer 24.00 <br />Franklin Madsen 32.00 <br />Earl Schulke 32.00 <br />EV Rathbun 32.60 <br />Total 152.60 <br /> <br />Road and Bridge <br />Big Lake Gravel Co 711.00 <br />711.00 <br /> <br />th <br />Bal March 20 25,453.93 <br />Paid Out 863.60 <br />Bal 24,590.33 <br /> <br />Meeting adjourned. <br /> <br />EV Rathbun <br />Clerk <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.