My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.A. SWCSR 11-05-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Sherburne Wright Cable Commission
>
SWC Packets
>
2015
>
11-05-2015
>
6.A. SWCSR 11-05-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 2:59:54 PM
Creation date
12/8/2015 2:59:54 PM
Metadata
Fields
Template:
City Government
type
SWCSR
date
11/5/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• w <br /> October Production Report <br /> Good Morning, <br /> October wasn't an overly busy month,but it was a steady month. <br /> Finally got a couple of football games in Elk River. <br /> Worked on the sewer video, I think the script if final. I've been to Buffalo sewer plant and Elk <br /> River plant twice for footage. A huge thanks to Phil and Bobby from Delano. Bobby wrote the <br /> script and toured the Buffalo plant with me. <br /> The big project this month ended up being kind of a last minute project. <br /> Buffalo's Operation Bounce Back, sponsored by the Buffalo Hospital started with a promo type <br /> video. They supplied several cell phone videos and some stills that they wanted set to music. <br /> They played the video before the seminar. My son and another Volunteer from Buffalo, Tom, <br /> helped me record. <br /> Here is a link to that video, the whole thing is about an hour long, but I put the promo in the <br /> beginning. To be honest, I'm a little proud of the promo. <br /> http://swtv.pegcentral.com/player.php?video=24aba2de7bea49d1 d02c8765bacf64e6 <br /> Rockfords movie was cancelled, we couldn't get any volunteers to help put up the screen. <br /> Our last movie make up date in Monticello, on the 30th, Into the Woods played in the council <br /> chamber. <br /> I've been trying to take opportunities where I can to prepare for future videos. Saturday, Delano <br /> had a controlled training burn that my son and I taped. I talked to Fire Chief VanLith about the <br /> City Works Public Safety Fire Department video. <br /> I've also been in contact with Police Chief Scharf in Big Lake about the Public Safety Police <br /> video. <br /> Delano has a new producer for meetings, and he seems to be working out well. <br /> Buffalo will have a new producer soon. <br /> I backed up in Monticello for 3 meetings <br /> Thanks <br /> Mark <br /> Completed Projects <br /> Operation Bounce Back-Buffalo <br /> 2 Football games <br /> Monticello Movie in the park <br /> Upcoming Projects <br /> Big Lake Beyond the Yellow Ribbon Presentation. I was asked by the Mayor to record this and put it <br /> their channel. <br /> City Works Sewer is close I'm taping voiceover today I think I have all the footage I need. <br /> I've started playing with the basketball schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.