My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. - 5. ICESR 07-12-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2012
>
07-12-2012
>
3. - 5. ICESR 07-12-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2012 2:04:42 PM
Creation date
7/31/2012 12:15:30 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
7/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> TO: Ice Arena Commission, Members <br /> FROM: Rich Czech, Arena Manager <br /> DATE: July 12, 2012 <br /> SUBJECT: Agenda Memo—July 5, 2012 <br /> 3.Renovation of Arena <br /> At the last Arena Commission meeting in April we discussed having four options <br /> prepared for the renovation of the Arena so that they could be presented to the City <br /> Council at a work session before the end of the summer. The options were to layout the <br /> benefits and the drawbacks to each option. <br /> Jerry Gumphrey and I met with the Architect and came up with the attached options. <br /> The first option is to do nothing to the Arena. By not addressing the issue of the leak in <br /> the roof and air quality (dehumidification) in the Barn the useful life expectancy of the <br /> barn is projected for another 9— 12 years. During this time the building will significantly <br /> deteriorate and the refrigeration system will become obsolete and will sooner or later fail. <br /> The second option is a bandage approach that would buy time before major <br /> improvements would have to be made. The option is a short or quick fix but in the end it <br /> falls way short of the immediate or future needs of the Arena. <br /> The third option is a plan that starts addressing the necessary repairs that are needed for <br /> the long term operations of the Arena while providing a foundation to grow upon future <br /> needs. The new roof proposed would be a long term repair while the new <br /> dehumidification system would greatly increase the air quality. The much needed <br /> expansion of the locker rooms in the Barn and the lobby would bring the Arena up to date <br /> and the start of changing over the refrigeration system would significantly improve the <br /> operations of the Arena. <br /> The fourth option replaces the Barn, adds new locker rooms throughout the complex and <br /> expands the lobby to accommodate both rinks. Team locker rooms would be replaced <br /> with larger updated rooms that would address air quality issues that are prevalent in the <br /> existing locker rooms. A new upper level lobby would include a concessions area, <br /> storage, restrooms, and meeting facilities. Both ice plants would be replaced with a <br /> centralized updated system and would address the need for dehumidification for the Barn <br /> facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.