My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2. SPSR 09-08-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Site Plan Review
>
2010
>
09-08-2010
>
2. SPSR 09-08-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2010 11:25:39 AM
Creation date
9/3/2010 11:24:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2, 2010 <br />Re: Conditional Use permit, Elk River Lutheran Church - ELCA for 19437 Evans, Elk River <br />We are seeking to use the property at 19437 Evans, Elk River for our Church office, meeting and <br />worship space on a temporary basis for up to five years. Currently we are assembling on Sunday <br />mornings at Lincoln Elementary and are renting an office in Downtown Elk River. The proposed <br />lease agreement is for two years with aone-year option. It is the intention of Elk River Lutheran <br />Church to purchase land in the Elk River area and build a permanent structure within this <br />timeline. <br />Two additional bathrooms will be added to the existing facility to meet code requirements. The <br />existing office space will be enclosed to give the pastor a private conference space and additional <br />office space and classroom space will be defined by the use of portable walls. The combined <br />three exits of 144 inches exceed the minimum fire exit requirements. Existing parking of 126 <br />spaces is sufficient for the calculated maximum occupancy load of the assembly. No free- <br />standing signage will be constructed, there is no proposed screening of the site and no outdoor <br />storage will be sought. <br />The primary use of the space will take place on Sunday mornings between the hours of 8 am and <br />12:30 pm. Monday through Friday the office will be used for work and occasionally for small <br />group meetings of between five and twenty people. Currently there are two employees and <br />several volunteers. We project adding up to 5 employees during the time of the lease. The space <br />will also be used for evening meetings of between two and twenty people. Confirmation classes <br />have not yet been scheduled but are likely to be scheduled one evening each week. Sunday <br />school will be scheduled during the Sunday morning hours directly after the first worship <br />service. <br />Sunday morning will be the only time that a substantial number of parking spaces will be used. If <br />we experience our anticipated growth, a second service will be added on Sunday morning. The <br />Sunday school for children will be scheduled for the hour between the two services to allow time <br />for the parking lot to be cleared before people start arriving for the second service. When we do <br />schedule a second service time, the parking lot will still be cleared by the 12:30 time. (With our <br />current schedule with one worship service, the parking lot clears by about 11:00.) During <br />weekdays and on any evenings, we anticipate that fewer than thirty parking places will be used at <br />any one time for scheduled meetings and confirmation classes. During the season of Lent, <br />Wednesday evening services may be scheduled with an anticipated attendance of about 50. <br />We anticipate sufficient growth will happen over the next three years that will require the <br />addition of a second worship time. It is planned to control the size of any one assembly to be less <br />than the calculated maximum occupancy by adding additional worship times within the Sunday <br />morning time slot. The maximum daily worship attendance is likely to be on Christmas and <br />Easter. On those days, the assembly size will be controlled by adding enough services to <br />accommodate the anticipated attendance. <br />Hours of operation (on back): <br />
The URL can be used to link to this page
Your browser does not support the video tag.