My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6.B. SR 04-05-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
04-05-2010
>
5.6.B. SR 04-05-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2010 9:39:09 AM
Creation date
4/2/2010 9:39:08 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item # 5.6.B. <br />c~ <br />ver <br />MEMORANDUM <br />TO: Mayor and City Council <br />FROM: Phil Hals, Street Superintendent <br />DATE: April 5, 2010 <br />SUBJECT: 2010 Potential Overlay Projects <br />Past practice has been to do the street overlay projects on even numbered years and a <br />reconstruction project on the odd numbered years. The following list identifies the potential <br />overlay projects and commentary on each for 2010: <br />Ridgewood East <br />- Pavement condition warrants an overlay. <br />- Constructed in the mid 1970's, overlaid in 1987. <br />- The storm water is all handled as surface water and in some areas the City <br />does not have drainage easements. Due to large lots, there is potential to do <br />"rain garden" infiltration ponds along the street edges in some locations. <br />- Unconfirmed reports are that some septic systems have been relocated once <br />and may be near failure a second time, making the addition of sewer and <br />water a consideration. <br />2. Industrial Boulevard <br />- Pavement condition warrants a mill and overlay. <br />- Constructed in the 1970's and overlaid on 1987. <br />- The east section has never had concrete curb and gutter. <br />- General condition of the existing curb and gutter on the west section is <br />good. <br />Elk Hills Development <br />- Pavement condition warrants an overlay. <br />- Paved in the 1970's with no record of overlay. <br />4. Main Street from Lowell Avenue to Orono Bridee <br />- 2009 discussion of full depth reclamation and repairing <br />
The URL can be used to link to this page
Your browser does not support the video tag.