Laserfiche WebLink
Item # 5.6.B. <br />c~ <br />ver <br />MEMORANDUM <br />TO: Mayor and City Council <br />FROM: Phil Hals, Street Superintendent <br />DATE: April 5, 2010 <br />SUBJECT: 2010 Potential Overlay Projects <br />Past practice has been to do the street overlay projects on even numbered years and a <br />reconstruction project on the odd numbered years. The following list identifies the potential <br />overlay projects and commentary on each for 2010: <br />Ridgewood East <br />- Pavement condition warrants an overlay. <br />- Constructed in the mid 1970's, overlaid in 1987. <br />- The storm water is all handled as surface water and in some areas the City <br />does not have drainage easements. Due to large lots, there is potential to do <br />"rain garden" infiltration ponds along the street edges in some locations. <br />- Unconfirmed reports are that some septic systems have been relocated once <br />and may be near failure a second time, making the addition of sewer and <br />water a consideration. <br />2. Industrial Boulevard <br />- Pavement condition warrants a mill and overlay. <br />- Constructed in the 1970's and overlaid on 1987. <br />- The east section has never had concrete curb and gutter. <br />- General condition of the existing curb and gutter on the west section is <br />good. <br />Elk Hills Development <br />- Pavement condition warrants an overlay. <br />- Paved in the 1970's with no record of overlay. <br />4. Main Street from Lowell Avenue to Orono Bridee <br />- 2009 discussion of full depth reclamation and repairing <br />