My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 04-05-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
04-05-2010
>
5.5. SR 04-05-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2010 9:41:32 AM
Creation date
4/2/2010 9:16:28 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />To Item Number <br />Ma or and Ci Council 5.5. <br />Agenda Section Meeting Date Prepared by <br />Administration A ri15, 2010 Lori ohnson, Ci Administrator <br />Item Description Reviewed by <br />Discuss Line Avenue Area Trail Project <br /> Reviewed by <br />Action Requested <br />Provide staff direction on Line Avenue pedestrian facility improvements. <br />Background/Discussion <br />The 2010 Capital Improvement Plan (CIP) included funding for Line Avenue improvements described as <br />an overlay of Line Avenue and consideration "of trail extension from Trott Brook Farms addition to <br />existing trail on CSAH 13." We recently discovered, however, during the bid award of the Line Avenue <br />overlay that the trail was not included as part of that project. In researching the trail project further, we <br />discovered that the cost for the trail was not included in the 2010 CIP cost estimate fox Line Avenue <br />either, although discussion of the trail was included in the description. Additionally, John Anderson <br />stated that no engineering work has been done on this project. <br />The proposed trail project connects two existing trails by adding trail along the east side of Twin Lakes <br />Road between Trout Brook Parkway and the existing trail that ends just north of Line Avenue. The cost <br />to complete the 800 feet of trail along Twin Lakes Road is estimated at $60,000 - $80,000 for <br />construction. Engineering would be additional. If the Council initiates this project, the CIP will be <br />adjusted to allocate funding for this project. <br />In addition to the Twin Lakes trail, there are other possible trail additions in this area that provide <br />pedestrian facility connections from the pedestrian bridge on highway 169 to the surrounding <br />neighborhoods, the commercial area south of County Road 12/Main Street and to the Northstar Station. <br />Cost estimates for those connections have not been made. Attached are maps prepared by John <br />Anderson that identify existing pedestrian facilities, the Twin Lakes trail connection and other potential <br />trail locations. <br />Finally, the trail project can be initiated at any time. This project could not be added by change order to <br />the existing Line Avenue project because that contractor would not do the type of construction required <br />for the trail extension. This project, if approved, will be bid as a separate project. Staff will be prepared <br />to discuss the possible pedestrian facilities in more detail at Monday's meeting. <br />Financial Impact <br />The cost depends upon the scope of the project; a minimum of $60,000 plus engineering is the estimated <br />cost fox the Twin Lakes trail connection. <br />S:\Public Bodies\Council\Lori\2010\Line Avenue 04 05 l0.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.