My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 01-12-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2010
>
01-12-2010
>
4.1. ERMUSR 01-12-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2010 3:12:30 PM
Creation date
1/12/2010 3:12:30 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />January 5, 2010 <br />To: Elk River Municipal Utilities Commission <br />John Dietz <br />Jerry Gumphrey <br />Daryl Thompson <br />From: Troy Adams <br />Subject: Review State Fuel Contract Pricing <br />~I. <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />In October the City submitted their numbers for the state diesel and gas bids. The numbers <br />submitted included the Utilities for 3,600 gal of diesel and 7,800 gal of gas. This is <br />approximately 75% of the Utilities' 2010 projected usage. This will require the Utilities staff to <br />fuel up at the City Garage most of the time. Because of the recent upgrade to the Utilities' fuel <br />pump, the City's and Utilities' fuel pump work off the same card system. This should make <br />tracking usage and billing easier. <br />From January 2010 - 2011, the contract price for 87 Octane unleaded is $2.0989 and BS diesel is <br />$2.2354. Compared to current prices at the pump, this will result in an approximate $6,000 <br />savings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.