My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-15-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2009
>
12-15-2009
>
4.1. ERMUSR 12-15-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2009 9:46:29 AM
Creation date
12/17/2009 9:46:28 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ji <br />Elk River ---1 <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />December 9, 2009 <br />To: Elk River Municipal Utilities Commission <br />John Dietz <br />Jerry Gumphrey <br />Daryl Thompson <br />From: Troy Adams <br />Subject: Review and Consider 2010 Budget, Rate, and Fee Changes <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />Enclosed for commission review and consideration is the proposed 2010 Budget. The Great <br />River Energy rate increase has been finalized with no changes from the preliminary numbers <br />used by staff during the electric rate design process. The proposed budget reflects the new 80/20 <br />Electric/Water split for the applicable accounts as well as some minor changes to the capital <br />budget and expense budget. The change from a 75/25 split to the 80/20 split resulted in an <br />approximate $79,000 shift in cost from Water to Electric. Other analysis identified additional <br />areas where expenses needed to be allocated differently between Water and Electric. This <br />included some costs associated with meter reading and fuel. These changes do impact the Water <br />and Electric budgets. <br />The Water budget profit margin increase by approximately $90,000 to be -$322,980. The Water <br />net to reserves increased by approximately $82,000 to be -$56,530. <br />The Electric budget needed to revise the rate increase to compensate for the increases in <br />expenses. This was done through a minor increase in the winter energy (kWh) charge for <br />residential and non-demand small commercial as well as a minor increase in energy (kWh) <br />charge for demand commercial. The Electric budget profit margin increase by approximately <br />$10,000 to be.$388,020. This is still an approximate 1.5% profit margin. The Electric budget <br />net to reserves decreased by $16,449 to be $339,597. This is the result of an increase in capital <br />projects to reflect current and more accurate costs. <br />Also included is the proposed 2010 Fee Schedule reflecting the proposed rate changes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.