My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFORMATION #1 06-05-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
06-05-1995
>
INFORMATION #1 06-05-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2009 3:32:40 PM
Creation date
11/30/2009 3:32:40 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/5/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMA710N <br />1326 Energy Park Drive <br />51. Paul, MN 55108 <br />6I2-644-4389 <br />1.800.888-2923 <br />Fax:612-644.9446 <br />CIVIL ENGINEERING <br />ENVIRONMENTAL <br />May 31, 1995 <br />File: 230-235-80 ~' T~® , <br />7 <br />Mr. Jim Povich <br />Minnesota Department of Transportation <br />District 3 <br />1991 Industrial Pazk Road <br />Baxter, MN $6401 <br />RE: CITY OF ELK RIVER <br />F.Y. 1996 ISTEA PROJECT <br />GEOMETRIC AND SIGNAL IMPROVEMENTS AT <br />MAIN STREET AND TH 10 <br />Dear Mr. Povich: <br />The City of Elk River currently has the above referenced project programmed for ISTEA <br />funding in F.Y. 1996. The present signal was installed in 1978, but increased traffic <br />generated by surrounding development justifies left turn lanes and appropriate geometric <br />and signal modifications. In order to construct these improvements, it is cleaz that <br />right-of-way acquisition will be necessary. This acquisition may lead to the relocation of <br />an existing business. <br />MUNICIPAL Through discussions with the City Council and staff, we believe it will be difficult to obtain <br />""II''G the right-of--way and prepare the necessary documents to utilize the F.Y. 1996 funds. On <br />°W"~ behalf of the City, we therefore request aone-year delay for funding for this project to <br />sTRUCTURaL F.Y. 1997. It is our understanding that this delay would require that right-of--way <br />suRVenNG acquisiton, permits, approval of the project memorandum, and submission of construction <br />TRAEEIC plans for MnDOT review be completed by June 1, 1997- <br />iRANSPORTATION <br />ELECTRICAUMECHANICAL This project is extremely important to the City and they have every intent on completing <br />ENGINEERING: the work. We are hopeful that you and your committee look favorably on this request for <br />evAC aone-yeaz delay. Please contact me if you have any questions or require further <br />POWER LNSTRIBMON information. <br />SCADA <br />SYSTEM CONTROLS Sincerely, <br />MS'A~CONSULyTING EN,( <br />Terry J. Maurer, P.E. <br />City Engineer <br />OFFKES IN: 'j'JM;pd <br />INNEAPOLIS <br />RIOR IAKE cc: Mike Tazdy, MnDOT <br />ST. PAUL Pat Klaers, City of Elk River <br />WASECA 135-3101.may <br />
The URL can be used to link to this page
Your browser does not support the video tag.