Laserfiche WebLink
ITEM 6. <br />June 22, 1995 <br />43ULTINUEN619EER5 File: 230-271-10 <br />1326 Energy Park give <br />sr- Paul, MN sloe Honorable Mayor and City Council <br />612544-4389 City of Elk River <br />1-800-888.2923 13065 Orono Parkway <br />Fax: 612-644-9446 P.O. Box 490 <br />Elk River, MN 55330 <br />RE: 1995 OVERLAY PROJECTS <br />PUBLIC HEARING <br />Deaz Council Members: <br />As you are aware, the public hearing for the 1995 Overlay Improvement project is <br />scheduled for the June 26, 1995, City Council meeting. The areas to be overlaid aze <br />Greenhead Acres 1st, 2nd, and 3rd Additions, Country Side Acres, and the Avon Acres <br />CMLENGINEERINCa Area. As you recall from the feasibility study, the project is proposed to be 100% assessed <br />ENmaoNMRNTA` to the benefitting property owners at a rate of $1,505 per unit. <br />MUNICIPAL <br />PIA""'NO I will have a handout prepazed for the public hearing which will detail the project and the <br />uownsTE assessment procedure. I will also be prepared after the presentation to answer any <br />RucTURAL questons that the public may have. As you will recall from the project schedule, after the <br />suevenrrG closure of the public hearing, if the Council decides to move forwazd with this project, the <br />reAPElc next step would be to order the improvement and authorize the advertisement for bids. <br />TRANSPORTATION Attached for your consideration are two draft resolutions which would initiate the next step. <br />ELECTRICAL/MECHANICAL <br />ENGINEER,"O, <br />If you have any questions regarding this project, please call. <br />HVAC <br />POWER DISTRIBUTION Sincerely, <br />scnoa <br />svsTEMCONTROLS GI <br />NEERS <br />MSA, CONSULTI <br />G EN <br /> N <br />~ <br />~ <br />~~Ll~/`~~GGCLCGC/ <br /> Terry J. Maurer, P.E. <br />TJM:tw <br />Enclosure <br />OPFICESIN: T71-2230jun <br />MINNEAPOLIS <br />~IOR IAKE <br />eT. PAUL <br />WASECA <br />