Laserfiche WebLink
Elk River <br />Municipal Utilities <br />13069 Orono Parkway • P.O. Box 430 <br />Elk River, MN 55330-0430 <br />April 8, 2009 <br />To: Elk River Municipal Utilities Commission <br />John Dietz <br />Jerry Gumphrey <br />Daryl Thompson <br />From: Troy Adams <br />Subject: Review 2009 Construction Projects <br />Phone: 763.441.2020 <br />Fax: 763.441.8099 <br />There are already many electrical department small projects (under $10,000) already scheduled <br />to be completed this spring. Many of these projects will require cable installation by method of <br />underground boring or pushing. Because Elk River Municipal Utilities doesn't have the <br />specialized equipment to do this type of work, this would be completed by third party <br />contractors. Most of these types of small projects require quick scheduling and installation to <br />provide good and timely customer service. Staff requests Commission approval to secure third <br />party work for process ERMU is not equipped to do for projects under $10,000. <br />As an update to other construction projects scheduled and approved for 2009, planning and <br />material acquisition continues with construction season fast approaching. The Twin Lakes <br />Estates 2°d housing addition will probably be the first to start installation. Materials are already <br />in stock for this project. The County Road 1 Feeder project required for the Connexus territory <br />acquisition in 2010 is still in planning. Because of the easements, driveways, roadways, <br />landscaping, and wetlands along the project running line, there will be significant underground <br />boring required. This was known during the budgeting and planning process which started in <br />early 2008. Depending on the locations of other utilities, ERMU intends to complete as much of <br />the installation work as possible. Still, much of this work will need to be bid out for third party <br />contractor installation. Staff requests Commission approval to move forward with the formal <br />bidding process to be able to bring bids back to the May Commission meeting for approval. <br />